Health Care
NHS WHS MacLean Building

MacLean Building
We addressed deteriorating masonry by conducting a thorough building evaluation and detailed building envelope assessment to identify the extent of damage. Our process included specialized masonry testing to verify the integrity and adhesion of the new cladding system. Based on these findings, we added a liquid-applied air barrier in addition to a steel cladding system, to ensure long-term safety and building envelope performance.
Before


After


Giorgio Giovinazzo Architect
16 Empress Ave, Welland, ON 289 820 8090
© 2025 Powered by Ona WordPress theme